30th November; The second layer of the roof is on; the external walls are all done; the cedar wood cladding is started. Internal walls are going up fast too!

20181130_151705a20181130_152212

14th November 2018; the roof is going on and the walls are going up

181114

181104 (4)181104 (2)181104 (1)

27th October 2018: The block and beam floor is in

IMG_2072IMG_2076

11th October 2018: The frame goes up

IMG_1943IMG_1944

15th September 2018: The foundations are being poured: